PROJECTS


Essaouira Bricks Factory & Mahaweel Bricks Factory


A partnership contract between the Gulf Coast Company for General Trade and Industrial Investments and the Iraqi Ministry of Industry for the development and expansion of the Al-Suwaira brick factory located in the city of Wasit, east of Iraq and southeast of Baghdad, and the Al-Mahaweel brick factory, which is located in Babil Governorate, as this project is considered a key factor in the development and development of industrial and construction resources in the country .

The project includes adding new production lines for bricks (Al-Jif Qim) and decorative bricks that are imported from outside Iraq, and increasing the total production capacity of the two factories.

Gulf Coast General Trading and Industrial Investments Company works to develop these projects with high accuracy and the highest quality with qualified engineering cadres to obtain the best quality of the product and to maximize the country’s resources.

Completed projects


Tender Number and Date:
(81/Municipalities) on (13/08/2006)
Project Name:
Works of cleaning Al-Qurnah district municipality.
Execution Period:
140 days
Beneficiary body:
Directorate of Qurnah District Municipality
Project Value:
IQD 245,000,000
The work shall include the following:
  • Removing the home waste from the residential districts and removing all garbage, dirt, debris, and building wastes, dead animals, left furniture, vehicles structures, tires left in the streets and sidewalks, squares and crosses and removing all wastes from the commercial areas and the restaurants and hotels wastes etc. and removing the waste from the industrial regions such as the accumulated fats, back up tools, tires left , the factories and laboratories wastes such the paper, cardboard and woods etc in addition to removing of all garbage gathered in the hospitals and the health utilities etc for a period of (140) days.

Tender Number and Date:
78/ municipalities) on (14/08/2006)
Project Name:
performing the works of cleaning the municipality of Qurnah district
Execution Period:
140 days
Beneficiary Body:
Directorate of Qurnah District Municipality
Project Value:
IQD 535,000,000
The work shall include the following:
  • The working and removing the home waste from the residential districts and removing all garbage, dirt, debris, and building wastes, dead animals, left furniture, vehicles structures, tires left in the streets and sidewalks, squares and crosses and removing all wastes from the commercial areas and the restaurants and hotels wastes ..etc. and removing the waste from the industrial regions such as the accumulated fats, back up tools, tires left , the factories and laboratories’ wastes such the paper, cardboard and woods etc for (140) days.

Tender Number and Date:
(95/Municipalities ) on (31/08/2006)
Project Name:
backfilling with dust and spiece./ Ezzedine Salim district
Execution Period:
100 days
Beneficiary Body:
Directorate of Ezzedine Salim District Municipality
Project Value:
IQD 234,100,000.
The work shall include the following:
  • Performing the works of amending, adjusting and backfilling with a thickness of (20-60) cm, quantity- (50,000) m2
  • Supplying and spreading the stones, quantity (55600) m2.

Tender Number and Date:
(17/water) on 03/09/2006
Project Name:
Supplying, installing and operating tanked water unit in Hosh area.
Execution Period:
120 day
Beneficiary Body:
Basra Water Directorate
Project value:
IQD 945,050,950
The work shall include the following:
  • Supplying and installing 1 bulk water unit with capacity of one million gallon/day.
  • Leveling, excavating , backfilling by soil and backfilling by sub-base works(2165 m2).
  • Concrete casting and flatting works (395 m2).
  • Supplying, extending, and backfilling carrier pipes of (12 inch) diameter and (160 m watt) length.
  • Supplying, extending, drilling and backfilling Polyethylene pipes of (225mm) diameter and(1250 m watt) length.
  • Supplying, extending, drilling and burying Polyethylene pipe of (110mm) diameter and(2750 m watt) length.

Tender Number and Date:
(1 sewerage ) on (14/06/2007)
Project Name:
Performing a new rain streams network in ( The street located between the marine leadership and the Baghdad street cross)
Execution Period:
180 days
Beneficiary Body:
Basra Sewerage Directorate
Project value:
IQD 3,996,863,500
The work shall include the following:
  • The works of extension of U.P.V.C tubes for the sizes (800, 600, 500, 400, 300, 200) with a length of (4200 m)
  • The works of re-cladding the tiled streets with a length of (4000) m